Production Technology
21. CPM has following time estimate
- one time estimate
- two time estimate
- three time estimate
- four time estimate
- nil time estimate.
Correct answer: (A)
one time estimate
22. CPM is the
- time oriented technique
- event oriented technique
- activity oriented technique
- target oriented technique
- work oriented technique.
Correct answer: (C)
activity oriented technique
23. CPMis
- synthesising in concepts
- is built of activities oriented program-mes
- is, based on one time eytimate
- is used for repetitive works
- all of the above.
Correct answer: (E)
all of the above.
24. Critical path moves along the activities having total float of
- positive value
- negative value
- zero value
- same value
- none of the above.
Correct answer: (C)
zero value
25. Critical Path Net Work helps an engineer
- to concentrate his attention on critical activities
- to divert the resources from non-critical advanced activities to critical activities
- to be cautious for avoiding any delay in the critical activities to avoid delay of the whole project
- all of the above
- none of the above.
Correct answer: (D)
all of the above
26. Criticalpath on PERT/CPM chart is obtained by joining the events having
- maximum slack
- minimum slack
- average slack
- no slack
- judgement and experience.
Correct answer: (B)
minimum slack
27. Current assets include
- manufacturing plant
- manufacturing plant and equipment
- inventories
- common stock held by the firm
- all of the above.
Correct answer: (A)
manufacturing plant
28. Descripancies of bar chart techniques are
- consequential effects of lack in one activity on omer
- consequential effects of lack in one activity on the finish date
- free time available for an activity can't be predicted
- effective monitoring/controlling can't be done
- all of the above.
Correct answer: (E)
all of the above.
29. Emergency rush order can be pushed more effectively in
- job production
- automatic production
- continuous production
- intermittent production
- none of the above.
Correct answer: (D)
intermittent production
30. Expediting function consists in keeping a watch on
- operator's activity
- flow of material and in case of trouble locate source of trouble
- minimising the delays
- making efficient despatching
- none of the above.
Correct answer: (B)
flow of material and in case of trouble locate source of trouble