Industrial Engineering

11. Basic motion time study gives times for basic motions in ten thousandths of

  1. second
  2. minute
  3. hour
  4. day
  5. none of the above.

Correct answer: (B)
minute

12. Basic tool in work study is

  1. graph paper
  2. process chart
  3. planning chart
  4. stop watch
  5. analytical mind.

Correct answer: (D)
stop watch

13. Bin card is used in

  1. administrative wing
  2. workshop
  3. foundary shop
  4. stores
  5. assembly shop.

Correct answer: (D)
stores

14. Break-even analysis can be used for

  1. short run analysis
  2. long run analysis
  3. average of above two run analysis
  4. there is no such criterion
  5. none of the above.

Correct answer: (A)
short run analysis

15. Break-even analysis consists of

  1. fixed cost
  2. variable cost
  3. fixed and variable costs
  4. operation costs
  5. none of the above.

Correct answer: (C)
fixed and variable costs

16. Break-even analysis shows profit when

  1. sales revenue > total cost
  2. sales revenue = total cost
  3. sales revenue < total cost
  4. variable cost < fixed cost
  5. none of the above.

Correct answer: (A)
sales revenue > total cost

17. Choose the wrong statement Time study is used to

  1. determine overhead expenses
  2. provide a basis for setting piece prices or incentive wages
  3. determine standard costs
  4. determine the capability of an operator to handle the number of machines
  5. compare alternative methods.

Correct answer: (A)
determine overhead expenses

18. Choose the wrong statement. Motion study is used for

  1. improving a work method
  2. improvising a work method
  3. designing a work method
  4. providing a schematic framework
  5. reducing inventory costs.

Correct answer: (E)
reducing inventory costs.

19. CPM has following time estimate

  1. one time estimate
  2. two time estimate
  3. three time estimate
  4. four time estimate
  5. nil time estimate.

Correct answer: (A)
one time estimate

20. CPM is the

  1. time oriented technique
  2. event oriented technique
  3. activity oriented technique
  4. target oriented technique
  5. work oriented technique.

Correct answer: (C)
activity oriented technique

Page 2 of 14