Production Technology
71. Monte Carlo solutions in queuing theory are extremely useful in queuing problems
- that can't be analysed mathematically
- involving multistage queuing
- to verify mathematical results
- all of the above
- none of the above.
Correct answer: (D)
all of the above
72. Motion study involves analysis of
- actions of operator
- layout of work place
- tooling and equipment
- all of the above
- none of the above.
Correct answer: (A)
actions of operator
73. O on a PERT/CPM chart represents
- an ordinary event
- a significant event representing some mile-stone
- an event to be transferred to other network chart
- dangling event
- dummy event.
Correct answer: (A)
an ordinary event
74. One of the basic essentials of an incentive plan is that
- a differential piece rate system should exist
- minimum wages should be guaranteed
- provide incentive to group efficiency performance
- all standards should be based on optimum standards of production
- all standards should be based on time studies.
Correct answer: (E)
all standards should be based on time studies.
75. One time measurement unit (TMU) in method time measurement system equals
- 0.0001 minute
- 0.0006 minute
- 0.006 minute
- 0.001 minute
- 0.06 minute.
Correct answer: (B)
0.0006 minute
76. Per cent idle time for men or machines is found by
- work sampling
- time study
- method study
- work study
- ABC analysis.
Correct answer: (A)
work sampling
77. PERT analysis is based on
- optimistic time
- pessimistic time
- most likely time
- all of the above
- none of the above.
Correct answer: (D)
all of the above
78. PERT and CPM are
- techniques to determine project status
- decision making techniques
- charts which increase aesthetic appearance of rooms
- aids to determine cost implications of project
- aids to the decision maker.
Correct answer: (E)
aids to the decision maker.
79. PERT has following time estimate
- one time estimate
- two time estimate
- three time estimate
- four time estimate
- nil time estimate.
Correct answer: (C)
three time estimate
80. PERT is
- an analytic tool in concept
- limit up of event oriented diagrams
- used for research and development projects
- based on three time estimates for activities linking up two events
- all of the above.
Correct answer: (E)
all of the above.