Production Technology
21. Choose the wrong statement Time study is used to
- determine overhead expenses
- provide a basis for setting piece prices or incentive wages
- determine standard costs
- determine the capability of an operator to handle the number of machines
- compare alternative methods.
Correct answer: (A)
determine overhead expenses
22. Choose the wrong statement. Motion study is used for
- improving a work method
- improvising a work method
- designing a work method
- providing a schematic framework
- reducing inventory costs.
Correct answer: (E)
reducing inventory costs.
23. CPM has following time estimate
- one time estimate
- two time estimate
- three time estimate
- four time estimate
- nil time estimate.
Correct answer: (A)
one time estimate
24. CPM is the
- time oriented technique
- event oriented technique
- activity oriented technique
- target oriented technique
- work oriented technique.
Correct answer: (C)
activity oriented technique
25. CPMis
- synthesising in concepts
- is built of activities oriented program-mes
- is, based on one time eytimate
- is used for repetitive works
- all of the above.
Correct answer: (E)
all of the above.
26. Critical path moves along the activities having total float of
- positive value
- negative value
- zero value
- same value
- none of the above.
Correct answer: (C)
zero value
27. Critical Path Net Work helps an engineer
- to concentrate his attention on critical activities
- to divert the resources from non-critical advanced activities to critical activities
- to be cautious for avoiding any delay in the critical activities to avoid delay of the whole project
- all of the above
- none of the above.
Correct answer: (D)
all of the above
28. Criticalpath on PERT/CPM chart is obtained by joining the events having
- maximum slack
- minimum slack
- average slack
- no slack
- judgement and experience.
Correct answer: (B)
minimum slack
29. Current assets include
- manufacturing plant
- manufacturing plant and equipment
- inventories
- common stock held by the firm
- all of the above.
Correct answer: (A)
manufacturing plant
30. Descripancies of bar chart techniques are
- consequential effects of lack in one activity on omer
- consequential effects of lack in one activity on the finish date
- free time available for an activity can't be predicted
- effective monitoring/controlling can't be done
- all of the above.
Correct answer: (E)
all of the above.