Production Technology
11. According to MAPI formula, the old machine should be replaced by new one when
- CAM < DAM
- CAM > DAM
- CAM = DAM
- there is no such criterion
- none of the above.
Correct answer: (A)
CAM < DAM
12. According to Rowan plan, if H = hourly rate, A = actual time and S = standard time, then wages will be
- HA
- HA + (S∽A) HA
- HA + ⋀⋀-H
- HA + ⋀⋀-H
- HA + ⋀⋀-HA.
Correct answer: (B)
HA + (S∽A) HA
13. Activity s,lack or float of any event on a PERT/CPM chart is represented by
- latest start time of succeeding event -earliest finish time of preceding event activity time
- latest start time of the event - earliest start time of the event
- latest finish time of event - earliest finish time of the event
- anyone of the above
- none of the above.
Correct answer: (D)
anyone of the above
14. An event is indicated on the network by
- a straight line
- a number enclosed in a circle or a square
- a straight line with circles at the ends
- a dotted line
- an arrow.
Correct answer: (B)
a number enclosed in a circle or a square
15. An optimum project schedule implies
- optimum utilization of men, machines and materials
- lowest possible cost and shortest possible time for project
- timely execution of project
- to produce best results under given constraints
- realistic execution time, minimum cost and maximum profits.
Correct answer: (B)
lowest possible cost and shortest possible time for project
16. Bar charts are suitable for
- minor works
- major works
- large projects
- all of the above
- none of the above.
Correct answer: (A)
minor works
17. Basic motion time study gives times for basic motions in ten thousandths of
- second
- minute
- hour
- day
- none of the above.
Correct answer: (B)
minute
18. Basic tool in work study is
- graph paper
- process chart
- planning chart
- stop watch
- analytical mind.
Correct answer: (D)
stop watch
19. Bin card is used in
- administrative wing
- workshop
- foundry shop
- stores
- assembly shop.
Correct answer: (D)
stores
20. Break-even analysis can be used for
- short run analysis
- long run analysis
- average of above two run analysis
- there is no such criterion
- none of the above.
Correct answer: (A)
short run analysis