Industrial Engineering

81. Material handling and plant location is analysed by

  1. Gnatt chart
  2. bin chart
  3. Emerson chart
  4. travel chart
  5. activity chart.

Correct answer: (D)
travel chart

82. Material handling in automobile industry is done by

  1. overhead crane
  2. trolley
  3. belt conveyor
  4. all of the above
  5. none of the above.

Correct answer: (A)
overhead crane

83. Merit Rating is the method of determining worth of

  1. a job
  2. an individual employee
  3. a particular division in workshop
  4. machine
  5. overall quality.

Correct answer: (B)
an individual employee

84. Micromotion study involves following number of fundamental hand motions

  1. 8
  2. 12
  3. 16
  4. 20
  5. 24

Correct answer: (C)
16

85. Micromotion study is

  1. enlarged view of motion study
  2. analysis of one stage of motion study
  3. minute and detailed motion study
  4. subdivision of an operation into therbligs and their analysis
  5. motion study of small components upto mircoseconds.

Correct answer: (D)
subdivision of an operation into therbligs and their analysis

86. Military organisation is known as

  1. line organisation
  2. line and staff organisation
  3. functional organisation
  4. all of the above
  5. none of the above.

Correct answer: (A)
line organisation

87. Motion study involves analysis of

  1. actions of operator
  2. layout of work place
  3. tooling and equipment
  4. all of the above
  5. none of the above.

Correct answer: (A)
actions of operator

88. One time measurement unit(TMU) in method time measurement system equals

  1. 0.0001 minute
  2. 0.0006 minute
  3. 0.006 minute
  4. 0.001 minute
  5. 0.06 minute.

Correct answer: (B)
0.0006 minute

89. Per cent idle time for men or machines is found by

  1. work sampling
  2. time study
  3. method study
  4. work study
  5. ABC analysis.

Correct answer: (A)
work sampling

90. Pick up the incorrect statement about advantages of work sampling

  1. permits a fine breakdown of activities and delays
  2. simultaneous study of many operators may be made by a single observer
  3. calculations are easier, method is economical and less time consuming
  4. no time measuring devices are generally needed
  5. as operators are not watched for long periods, chances of obtaining misleading results are less.

Correct answer: (A)
permits a fine breakdown of activities and delays