Industrial Engineering

41. Which of the following equations is not in conformity with others

  1. organisation performance x motivation = profits
  2. knowledge x skill = ability
  3. ability x motivation = performance
  4. attitude x situation = motivation
  5. performance x resources = organisation performance.

Correct answer: (A)
organisation performance x motivation = profits

42. Which of the following incentive plansrensures a part of the swing to the worker and rest to the employer

  1. Emerson efficiency plan
  2. Taylor plan
  3. Halsey premium plan
  4. Piece rate system
  5. Gilberth plan.

Correct answer: (C)
Halsey premium plan

43. Which of the following is not wage incentive plan

  1. differential piece rate system
  2. Rowan plan
  3. Emerson plan
  4. Taylor plan
  5. Halsey plan.

Correct answer: (D)
Taylor plan

44. Which of the following plans motivates supervisors by paying a premium on time saved by workers

  1. Halsey plan
  2. Rowan plan
  3. Haynes plan
  4. Emerson's plan
  5. Taylor's plan.

Correct answer: (C)
Haynes plan

45. Which one of the following represents a group incentive plan ?

  1. Scanlon Plan
  2. Rowan Plan
  3. Bedaux Plan
  4. Taylor Differential Piece Rate System
  5. Halsey Premium Plan.

Correct answer: (A)
Scanlon Plan

46. Work study comprises following main techniques

  1. method study and work measurement
  2. method study and time study
  3. time study and work measurement
  4. method study and job evaluation
  5. value analysis and work measurement.

Correct answer: (A)
method study and work measurement

47. Work study is concerned with

  1. improving present method and finding standard time
  2. motivation of workers
  3. improving production capability
  4. improving production planning and control
  5. all of the above.

Correct answer: (A)
improving present method and finding standard time

48. A graphical device used to determine the break-even point and profit potential under varying conditions of output and costs, is known as

  1. Gnatt chart
  2. flow chart
  3. break-even chart
  4. PERT chart
  5. Taylor chart.

Correct answer: (C)
break-even chart

49. A low unit cost can be obtained by following

  1. product layout
  2. functional layout
  3. automatic material handling equipment
  4. specialization of operation
  5. minimum travel time plan and compact layout.

Correct answer: (A)
product layout

50. ABC analysis deals with

  1. analysis of process chart
  2. flow of material
  3. ordering schedule of job
  4. controlling inventory costs money
  5. all of the above.

Correct answer: (D)
controlling inventory costs money