121. TMU in method time measurement stands for

  1. time motion unit
  2. time measurement unit
  3. time movement unit
  4. technique measurement unit
  5. time method unit.

Correct answer: (B)
time measurement unit

122. Travel charts provide

  1. an idea of the flow of materials at various stages
  2. a compact estimate of the handling which must be done between various work sections
  3. the information for changes required in rearranging material handling equipment
  4. an approximate estimate of the handling which must be done at a particular station
  5. solution to handling techniques to achieve most optimum results.

Correct answer: (B)
a compact estimate of the handling which must be done between various work sections

123. Under the Apprenticeship Act

  1. all industries have to necessarily train the apprentices
  2. industries have to train apprentices ac-cording to their requirement
  3. all industries employing more than 100 workers have to recruit apprentices
  4. only industries employing more than 500 workers have to recruit apprentices
  5. all industries other than small scale industries have to train apprentices.

Correct answer: (D)
only industries employing more than 500 workers have to recruit apprentices

124. Value engineering aims at finding out the

  1. depreciation value of a product
  2. resale value of a product
  3. major function of the item and accomplishing the same at least cost without change in quality
  4. break even point when machine re-quires change
  5. selling price of an item.

Correct answer: (C)
major function of the item and accomplishing the same at least cost without change in quality

125. What does symbol 'D' imply in work study

  1. inspection
  2. transport
  3. delay temporary storage
  4. permanent storage
  5. none of the above.

Correct answer: (C)
delay temporary storage

126. What does symbol 'O' imply in work study

  1. operation
  2. inspection
  3. transport
  4. delay temporary storage
  5. none of the above.

Correct answer: (A)
operation

127. Which of the following is independent of sales forecast

  1. productivity
  2. inventory control
  3. production planning
  4. production control
  5. capital budgeting.

Correct answer: (A)
productivity

128. Which of the following layouts is suited for mass production

  1. process layout
  2. product layout
  3. fixed position layout
  4. plant layout
  5. functional layout.

Correct answer: (B)
product layout

129. Which of the following layouts is suited to job production

  1. process layout
  2. product layout
  3. fixed position layout
  4. plant layout
  5. functional layout.

Correct answer: (A)
process layout

130. Which of the following organisation is preferred in automobile industry

  1. functional organisation
  2. line organisation
  3. staff organisation
  4. line and staff organisations
  5. scalar organisation.

Correct answer: (D)
line and staff organisations