41. Coal ash (or cinder) is used in initial stages of a new construction of railway for
Correct answer: (A)
Wooden sleepers
42. Composite sleeper index determines
Correct answer: (B)
Suitability of wooden sleepers
43. Composite sleeper index is the index of
Correct answer: (A)
Hardness and strength
44. Coning of wheels
Correct answer: (D)
All the above
45. Coning of wheels is provided
Correct answer: (D)
All the above
46. Consider the following statements about concrete sleepers.
1. They improve the track modulus.
2. They have good scrap value.
3. They render transportation easy.
4. They maintain the gauge quite satisfactorily. Of these statements
Correct answer: (D)
1 and 4 are correct
47. Consider the following statements:
Automatic signalling system results in
1. Greater risk
2. Higher efficiency
3. Avoidance of block instruments
4. Higher operating cost
Of these statements
Correct answer: (D)
2 and 3 are correct
48. Consider the following surveys.
1. Reconnaissance survey
2. Preliminary survey
3. Traffic survey
4. Location survey
The correct sequence in which these surveys are conducted before the alignment of a track is finalised is
Correct answer: (D)
3, 1, 2, 4
49. Continuity of electric current across welded rail joints, is maintained by
Correct answer: (D)
None of these
50. Creep is the
Correct answer: (A)
Longitudinal movement of rail