11. Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds
Correct answer: (D)
5.0 %
12. For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is
Correct answer: (B)
0.94 m3
13. For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is
Correct answer: (C)
0.274 m3
14. For the construction of buildings, the subheads of the estimate are
Correct answer: (D)
All the above
15. If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is
Correct answer: (B)
Bd + Sd2
16. If tensile stress of a steel rod of diameter is 1400 kg/cm2 and bond stress is 6 kg/cm2, the required bond length of the rod is
Correct answer: (D)
59 D
17. If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by
Correct answer: (D)
All the above
18. In case of laying gullies, siphons, intercepting traps, the cost includes
Correct answer: (D)
All of these
19. In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and
Correct answer: (B)
Half breadth of wall on each side
20. In the mid-section formula
Correct answer: (D)
All of the above