61. If the gross vehicle weight of a truck is 30 tonne and rolling resistance is 30 kg/tonne, then the tractive effort required to keep the truck moving at a uniform speed is
Correct answer: (C)
900 kg
62. If the output of a dragline for 90° angle of swing at optimum depth of cut is X, then the output for 120° angle of swing at 120 % of optimum depth of cut will be
Correct answer: (C)
Less than X
63. If the scheduled completion time of a project is more than the earliest expected time for completion of the project, then the probability of completion of the project within the scheduled completion time will be
Correct answer: (C)
More than 50 %
64. If the total float and duration of an activity are 5 and 10 days respectively, the particular activity can be
Correct answer: (D)
All the above
65. If TL is the latest allowable event occurrence time, total activity slack(s), is equal to
Correct answer: (D)
All the above
66. In CPM analysis,
Correct answer: (D)
All the above
67. In India, are prefabricated components costlier than those of traditional cast-in-situ items that the prefabricated components replace?
Correct answer: (C)
No, because of repetitive manufacture of a number of elements
68. In PERT analysis, the time estimates of activities and probability of their occurrence follow
Correct answer: (C)
Beta distribution curve
69. In resources levelling
Correct answer: (C)
Uniform demand of resources is achieved
70. In the time-cost optimisation, using CPM method for network analysis, the crashing of the activities along the critical path is done starting with the activity having
Correct answer: (C)
Least cost slope