91. For the design of retaining walls, the minimum factor of safety against overturning is taken as
Correct answer: (B)
2
92. For walls, columns and vertical faces of all structural members, the form work is generally removed after
Correct answer: (A)
24 to 48 hours
93. Grading of sand causes great variation in
Correct answer: (D)
All the above
94. Gypsum is added for
Correct answer: (C)
Controlling setting time
95. Half of the main steal in a simply supported slab is bent up near the support at a distance of 'x' from the center of slab bearing where 'x' is equal to (Where 'l'is the span)
Correct answer: (C)
l/7
96. Hardening of cement occurs at
Correct answer: (D)
None of these
97. High carbon content in the steel causes
Correct answer: (B)
Increase in tensile strength but decrease in ductility
98. High temperature
Correct answer: (B)
Decreases the strength of concrete
99. Higher workability of concrete is required if the structure is
Correct answer: (D)
Thick and heavily reinforced
100. Horizontal construction joints in concrete walls are generally provided at
Correct answer: (D)
All the above