Building Construction

1. A concrete structure is set on fire and the temperature raises to 1000°C. The strength of concrete as compared to original strength reduces to

  1. 10%
  2. 15%
  3. 20%
  4. 25%

Correct answer: (C)
20%

2. A covering of concrete placed on the exposed top of an external wall, is known as

  1. Cornice
  2. Coping
  3. Frieze
  4. Lintel

Correct answer: (B)
Coping

3. A cut in frame of a door to receive the shutter, is called

  1. Louver
  2. Stop
  3. Horn
  4. Rebate

Correct answer: (D)
Rebate

4. A floor constructed with 3 mm marble chips, is known

  1. Mosaic floor
  2. Terrazzo floor
  3. Chips floor
  4. Marble floor

Correct answer: (B)
Terrazzo floor

5. A floor constructed with the 4 to 6 mm marble chips, is known

  1. Reinforced marble floor
  2. Terrazzo floor
  3. Marble floor
  4. Chip floor

Correct answer: (B)
Terrazzo floor

6. A pointed arch which forms isosceles or equilateral triangle, is generally known as

  1. Three centred arch
  2. Two centred arch
  3. Lancet arch
  4. Bull's eye arch

Correct answer: (C)
Lancet arch

7. A pre-stressed concrete pile is

  1. Easy to handle
  2. Lighter in weight
  3. Extremely durable
  4. All the above

Correct answer: (D)
All the above

8. A projecting piece usually provided to support a truss, is

  1. Cornice
  2. Coping
  3. Frieze
  4. Lintel

Correct answer: (C)
Frieze

9. A roof which slopes in four directions, is called

  1. Shed roof
  2. Gable end roof
  3. Hipped roof
  4. Gambrel roof

Correct answer: (C)
Hipped roof

10. A solid core of rock is formed inside the cylinder in the case of

  1. Auger boring
  2. Percussion drilling
  3. Diamond drilling
  4. Wash boring

Correct answer: (C)
Diamond drilling